DaSilva Field was the second of two fields that AFOA replaced in August 2025. As part of this project new electrical conduits and junction boxes were installed in the field to accommodate future planned sound system upgrades. This field was the second field at this school to utilize a TenCate Pivot non-infill turf system due to the benefits of superior performance and longevity.